Action Item: Check For Manure Buildup – 8000 IPW

技术服务 - 技术指南

This document sets out the step-by-step instructions for checking an In-Pen Weighing (IPW) Position for manure buildup, and resolving the issue if manure is found.

How to check for manure buildup

  1. Remove any manure buildup from the IPW rubber mat and any manure build up that is located under the IPW rubber mat overhang.

    2。 地点 IPW position into the service position.


A。随着 IPW position in its upright position, you should be able to place your hand on the top lip of the scale (where the spray nozzle is located) and apply pressure to tip it away from the water trough.
b. As you do this, the scale floor will move up out of the IPW frame. The back set of brackets act like a hinge for the scale during this motion.
3. Disconnect the data cable and the spray lines.
4. Using a shovel clean out any manure build up from under the IPW 规模。

5. Reconnect the data cable and spray lines.
6.将 IPW scale back into the frame. Ensuring that the scale is not rubbing or hung up on the frame.
a. The scale floor should sit flush with the top of the frame when viewing the position from the front.
7. Repeat this process for all IPW 秤。
8。 测试 IPW positions that were services with the test wand.
a. Stand on scale.
b. Place test want through the antenna over the water trough.
c. Hold test wand for 15 beeps.

技术支持

如果您还有任何问题,请联系 Vytelle SENSE 技术支持 [电子邮件保护] 或从美国和加拿大拨打免费电话:1-866-689-3477 分机号。 1 该团队的工作时间为周一至周五上午 7:00 至下午 5:00 MST(加拿大法定节假日除外)。 下班后,请留下详细的语音邮件、电子邮件或试用说明,TSR 将在下一个工作日回复。

针对使用 Google Chrome 浏览器进行打印进行了优化。

 

Translate »