Action Item: Check For Manure Buildup – 8000 IPW

Tegniese Diens - Tegniese Gids

This document sets out the step-by-step instructions for checking an In-Pen Weighing (IPW) Position for manure buildup, and resolving the issue if manure is found.

How to check for manure buildup

  1. Remove any manure buildup from the IPW rubber mat and any manure build up that is located under the IPW rubber mat overhang.

    2. plek IPW pos in die diensposisie.


a. Met die IPW position in its upright position, you should be able to place your hand on the top lip of the scale (where the spray nozzle is located) and apply pressure to tip it away from the water trough.
b. As you do this, the scale floor will move up out of the IPW frame. The back set of brackets act like a hinge for the scale during this motion.
3. Disconnect the data cable and the spray lines.
4. Using a shovel clean out any manure build up from under the IPW skaal.

5. Reconnect the data cable and spray lines.
6. Plaas die IPW scale back into the frame. Ensuring that the scale is not rubbing or hung up on the frame.
a. The scale floor should sit flush with the top of the frame when viewing the position from the front.
7. Repeat this process for all IPW skubbe.
8. toets IPW positions that were services with the test wand.
a. Stand on scale.
b. Place test want through the antenna over the water trough.
c. Hold test wand for 15 beeps.

TEGNIESE ONDERSTEUNING

As jy enige verdere vrae het, kontak asseblief Vytelle SENSE Tegniese Ondersteuning by [e-pos beskerm] of deur tolvry te skakel vanaf die VSA en Kanada: 1-866-689-3477 ext. 1 Die span is beskikbaar van Maandag tot Vrydag 7:00vm tot 5:00nm MST (uitgesluit Kanadese statutêre vakansiedae). Los asseblief 'n gedetailleerde stempos, e-pos of proefnota na-ure en 'n TSR sal die volgende werksdae reageer.

Geoptimaliseer vir druk met Google Chrome-blaaier.

 

Translate »